Commit Graph
7 Commits
Author SHA1 Message Date
admin 18beb3385f Add evidence-near semantic architecture experiments
Record the V1-V3 experiments and accept the minimal semantic-preservation first stage.
2026-08-19 15:46:22 +02:00
admin e04e2533fc Add one-command Meeting Lab benchmark runner
Add a repository-native runner for reproducible Meeting Lab benchmark runs on machines without Codex.

The runner:

- validates normalized Whisper input and Meeting Context
- checks Ollama availability and the requested model
- rejects preloaded Ollama models by default for clean benchmarks
- supports an explicit --allow-loaded-models override
- uses the selected production configuration:
  - qwen3.5:9b
  - target_chars=4500
  - max_chars=5500
  - min_chars=2500
  - overlap_blocks=0
  - think=false
  - temperature=0
  - num_ctx=32768
- executes the complete current pipeline
- creates unique benchmark output directories
- preserves artifacts up to failure
- records runtime, environment and validation metadata
- writes working_protocol.md only when the renderer contract passes

Add focused mocked tests and Linux-first setup documentation for the AI-PC.
The runner does not include Whisper execution.
2026-08-05 14:48:42 +02:00
admin 06f0e7e651 Implement Meeting Context V1 and extraction improvements
Introduce Meeting Context V1 with YAML schema, validation and template.
Support optional --meeting-context during chunk extraction.
Inject authoritative Meeting Context into extraction prompts.
Record Meeting Context provenance in extraction output.
Activate todos.md in shared prompt assembly.
Strengthen responsibility attribution and decision/todo boundaries.
Add focused Gold scenarios and validation tests.
Update architecture and pipeline documentation.
2026-08-01 16:49:48 +02:00
admin 90aa34d5d0 Implement Semantic Consolidator V0
- add deterministic canonicalization support for extraction items
- add facts-only semantic consolidation using local Ollama
- preserve source evidence and validate complete fact coverage
- add conservative merge rules and non-LLM tests
- record the first validated real-life consolidation benchmark
- document current scope, limitations and next evaluation step
2026-07-31 11:25:46 +02:00
admin f7ad9ba51f Establish prompt engineering baseline with Gold Standard tests
- introduce Gold Standard evaluation corpus
- document decision taxonomy
- define prompt-engineering methodology
- add regression workflow
- establish Prompt Version 2 baseline
- validate decision_simple, decision_deferred and decision_none
2026-07-30 12:13:10 +02:00
admin 07b0d80113 Implement first end-to-end meeting analysis pipeline 2026-07-30 09:15:38 +02:00
admin b2c195c365 Initial project structure 2026-07-21 16:32:49 +02:00