Add production order search and shift drill-down

This commit is contained in:
admin committed 2026-10-20 15:06:04 +02:00
1 parent 6e8eb6f50f
commit dcde029bc7
8 files changed
+742 -4

No files matched your search

+27
View File
@@ -221,3 +221,30 @@ completeness claim. Sources are still read sequentially, not transactionally.
Invalid selections return a German page-level error (HTTP 400). Source/settings
or rendering failures return a generic German error (HTTP 503), retaining the
selection controls without exposing exception text or credentials.
## Fertigungsauftrag search
The web UI links to `/orders?q=...` for a complete or partial FA number. Search
trims surrounding whitespace, rejects empty input, treats SQL wildcard characters
literally, and caps results at 25 distinct FAs. An exact match is listed first;
other results are ordered by FA. Repeated confirmation rows collapse into one FA
result, with separate workplace/article entries when needed. `/order?production_order=...`
shows the selected order and its affected shifts. Each shift links to the existing
live report URL with machine, shift start date and shift name.
The order view reads positive `Rückmeldemenge` rows from
`dbo.GRAFANA_PRODUCTION_CONFIRMATION`, matching the finished-production quantity
semantics of the shift report. The view's `Zeitstempel` is an ERP confirmation
timestamp; first and last timestamps do not describe uninterrupted machine runtime.
Each row is assigned to a configured machine by its exact `erp_workplace`, then
interpreted in that machine's site timezone. Local 22:00–05:59 belongs to the
night shift whose start date may be the previous day. Multiple rows for the same
FA, machine and shift sum their positive feedback m². Unknown or ambiguous
workplaces remain visible but cannot be assigned a configured shift.
The ERP gateway owns parameterized read-only SQL, the production-order service
owns mapping and shift grouping, and a dedicated presenter renders HTML. The
order/machine/shift model is the anchor for later order-specific KPI, roll/QS and
setup-sheet views; those data are not included yet. ERP timestamps are local
datetimes without offsets; autumn repeated-hour rows are interpreted as the
first occurrence, as in the existing confirmation gateway.